6 Slide a new O-ring onto the replacement liner.
7 Return the liner to the inlet, pushing it all the way in until the liner contacts
8 Line up the tab on the bottom of the septum assembly with the slot on the
9 Turn on the inlet. Allow the inlet and column to purge with carrier gas for
10 Restore the analytical method.
11 Reset the liner counter.
12 Check for leaks.
5975T LTM GC/MSD Operation Manual
the gold seal.
insert assembly and push down to connect. Slide the locking tab to the
back.
15 minutes before heating the inlet or the LTM column.
General Maintenance
4
127