Important Aspects For Test Setup - R&S SMM100A Getting Started

Vector signal generator
Table of Contents

Advertisement

®
R&S
SMM100A
To mount the R&S SMM100A in a rack
1. Use an adapter kit that fits the dimensions of the R&S SMM100A to prepare
the instrument for rack mounting. For information on the dimensions, see data
sheet.
a) Order the rack adapter kit designed for the R&S SMM100A. For the order
number, see data sheet.
b) Mount the adapter kit. Follow the assembly instructions provided with the
adapter kit.
2. WARNING! The R&S SMM100A can be heavy, e.g., if fully equipped. Use a
lifting equipment, see also
Lift the R&S SMM100A to shelf height.
3. Grab the handles at the front and push the R&S SMM100A onto the shelf until
the rack brackets fit closely to the rack.
4. Tighten all screws at the rack brackets with a tightening torque of 1.2 Nm to
secure the R&S SMM100A at the rack.
To unmount the R&S SMM100A from a rack
1. Loosen the screws at the rack brackets.
2. WARNING! The R&S SMM100A can be heavy, e.g., if fully equipped. Use a
lifting equipment, see also
Bring the lifting equipment to shelf height.
3. Remove the R&S SMM100A from the rack.
4. If placing the R&S SMM100A on a bench top again, unmount the adapter kit
from the R&S SMM100A. Follow the instructions provided with the adapter kit.
3.5

Important Aspects for Test Setup

Cable selection and electromagnetic interference (EMI)
Electromagnetic interference (EMI) can affect the measurement results.
To suppress electromagnetic radiation during operation:
● Use high-quality shielded cables, especially for the following connector types:
Getting Started 1179.1335.02 ─ 02
"Lifting and carrying the product"
"Lifting and carrying the product"
Preparing for Use
Important Aspects for Test Setup
on page 8.
on page 8.
16

Advertisement

Table of Contents
loading

Table of Contents