Preparing For Use; Lifting And Carrying; Unpacking And Checking - R&S SMM100A Getting Started

Vector signal generator
Table of Contents

Advertisement

®
R&S
SMM100A
3

Preparing for Use

Here, you can find basic information about setting up the instrument for the first
time.
3.1

Lifting and Carrying

See also
"Lifting and carrying the product"
► WARNING! The R&S SMM100A can be heavy, e.g., if fully equipped. Use a
lifting equipment, see also
Use the carrying handles at the side for lifting and carrying the
R&S SMM100A.
The handles at the front are only for pushing and pulling the instrument when
mounting in a rack, see
Rack",
on page 15.
3.2

Unpacking and Checking

1. Unpack the R&S SMM100A carefully.
2. Retain the original packing material. Use it to protect the control elements and
connectors when transporting or shipping the R&S SMM100A later.
See also chapter "Transporting" in the user manual.
3. Using the delivery notes, check the equipment for completeness.
4. Check the equipment for damage.
If the delivery is incomplete or equipment is damaged, contact
Rohde & Schwarz.
Getting Started 1179.1335.02 ─ 02
on page 8.
"Lifting and carrying the product"
Chapter 3.4.2, "Mounting the R&S SMM100A in a
Preparing for Use
Unpacking and Checking
on page 8.
13

Advertisement

Table of Contents
loading

Table of Contents