Acr10R Meter (If Applicable) - Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
2.3.3

ACR10R Meter (if applicable)

2.3.3.1 ACR10R single-phase connection
2.3.3.2 ACR10R three-phase connection
NOTE: Connect the power meter (PIN 21, 22) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
For AC/Hybrid system, there are two meter needed:
___________________________________________________________________
Page 32
Installation
Figure 44 ACR10R single-phase connection (if applicable)
Figure 45 CT meter three-phase connection (if applicable)
Alpha ESS Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents