Step 12: Open the battery front covers. Connect the BMS communication cable of the cable
box from Step 11 to the topmost battery at the right side. Then use the BMS communication
cable supplied with the batteries to connect the batteries to each other via the respective
connectors on the left side. If more battery modules are to be added you must mount them
before connecting.
NOTE: The front cover of the battery should not be opened more than 90° .
Step 13: Connect the power cables of the bottom battery from Step 2 to the side terminals of
the top battery. Make sure that red connects to red and black connects to black.
+
-
+
Step 14: Connect the power cable of the top battery from Step 2 to the terminals of the cable
box. Make sure that red connects to red and black connects to black.
___________________________________________________________________
Page 22
Installation
Figure 22 Wiring the Battry Power Cable
-
Figure 23 Wiring the Power Cable of the Cable Box