Power Meter; Meter Adl-3000 (If Applicable) - Alpha ESS Storion-SMILE5 Installation Manual

Energy storage system
Table of Contents

Advertisement

NOTE: when adding on battery modules, please install only by side.
You can add up to 6 extra batteries with each two in a string.

2.3 Power Meter

The power meter should be installed and connected in the distribution box. There are
three kinds of power meters, ADL-3000, SM 60A or backup box can be chosen.
ADL-3000: three-/ single-phase meter (with or without CT)
SM60A: single-phase meter
Backup Box: three-/ single-phase meter (Contain off-grid switching and
load management)
2.3.1

Meter ADL-3000 (If Applicable)

ADL-3000 single-phase connect (without CT, without meter plug), if applicable:
Figure 31 ADL-3000 single-phase Connect (with CT, without Meter Plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 single-phase connect (without CT, with meter plug), if applicable:
Figure 32 ADL-3000 single-phase Connect (without CT, with Meter plug)
___________________________________________________________________
LOAD
LOAD
Alpha ESS Co., Ltd.
Your Smart Energy
Page 22 of 40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents