Power Meter Wiring - Alpha ESS SMILE5 Installation, Operation & Maintenance Manual

Energy storage system
Table of Contents

Advertisement

27

2.3 Power Meter Wiring

The electricity meter should be mounted and connected at the grid transition point
(feed-in point) so that it can measure the grid reference and feed-in power. Alpha ESS
currently provides 4 different power meter solutions:
ADL-3000: three-/ single-phase meter (with or without CT)
SM60A: single-phase meter
Backup Box: three-/ single-phase meter (Contain off-grid switching and load
management)
ACR10R: Three-phase CT electric meter
Table 1 CT meter ratio and accuracy table
Model
ADL3000-N/CT & 300A/5A CT
ADL3000-N/CT & 400A/5A CT
ADL3000-N/CT & 400A/1A CT
ACR10R-200A CT
ACR10R-120A CT
2.3.1 Meter SM60A (If Applicable)
2.3.1.1 SM60A Connect (with meter plug), if applicable:
Figure 38 SM60A connect (with meter plug)
INTRODUCTION
Accuracy
CT ratio
60
0.6 kWh
80
0.8 kWh
400
4.0 kWh
200
2.0 kWh
120
1.2 kWh
LOAD
INTRODUCTION
2.3.1.2 SM60A connect (with meter plug), if applicable:
Figure 39 SM60A connect (without meter plug)
NOTE: Connect the power meter (PIN 5, 6) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
For AC/Hybrid system, there are two meter needed:
Option 1: with Meter Plug
Plug1
Plug2
Figure 40 Two Meter Connect,
with Meter Plug
2.3.2 Meter ADL-3000 (If Applicable)
2.3.2.1 Single-phase in House
ADL-3000 single-phase connection (without CT, without meter plug), if applicable:
Figure 42 ADL-3000 single-phase Connect (with CT, without Meter Plug)
NOTE: Connect the power meter (PIN 7, 8) to the meter port of the cable
box (PIN 3, 6) using the RJ45 cable.
LOAD
Option 2: without Meter Plug
Cabinet
Meter1
Meter2
AlphaESS
Grid Meter
PV Meter
RS485 PIN
RS485 PORT
RS485 PORT
3
6
5
6
5
6
Figure 41 Two Meter Connect,
without Meter Plug
6
RJ45
RS485
3
2122
LOAD
ADL-3000
L1
L1'
L2
L2'
L3
L3'
N
GRID
28

Advertisement

Table of Contents
loading

Table of Contents