2.3 Power Meter
The power meter should be installed and connected in the distribution box. There are
three kinds of power meters, ADL-3000, SM 60A or backup box can be chosen.
ADL-3000: three-/ single-phase meter (with or without CT)
SM60A: single-phase meter
Backup Box: three-/ single-phase meter (Contain off-grid switching and
load management)
ACR10R: Three-phase CT electric meter
2.3.1
Meter ADL-3000 (If Applicable)
ADL-3000 single-phase connect (without CT, without meter plug), if applicable:
Figure 28 ADL-3000 single-phase Connect (with CT, without Meter Plug)
NOTE: Meter 7, 8 connect the RJ45 3, 6, then RJ45 connect the cable box/super
cable box.
ADL-3000 single-phase connect (without CT, with meter plug), if applicable:
Figure 29 ADL-3000 single-phase Connect (without CT, with Meter plug)