Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 26

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Battery
Position.
Battery
2. If there are
two or more than two
following:
Battery
Position.
Non-bottom
battery
Bottom battery
NOTE: The DIP setting is only changed on the last battery.
If you connect more than 2 battery modules to the system, please only install the additional
batteries 3-6 by the side of the system. You can connect up to 6 batteries, 2 each mounted on
top of each other, to the SMILE5.
To do this, carry out the individual installation steps as for the first two batteries, including the
DIP setting on the last module.
NOTE: Recommended external PV circuit breaker rating is not less than 25A.
NOTE: the RCD unit must be installed. A 100mA RCD device is recommended.
___________________________________________________________________
Page 24
Installation
DIP 1
DIP 2
OFF
ON
BATs, the DIP switch of the BATs must be set as the
DIP 1
DIP 2
OFF
OFF
OFF
ON
Figure 26 Increase the Battery Modules
Alpha ESS Co., Ltd.
DIP 3
DIP 4
OFF
OFF
DIP 3
DIP 4
OFF
OFF
OFF
OFF
DIP Switch
DIP Switch

Advertisement

Table of Contents
loading

Table of Contents