Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 20

Energy storage system
Hide thumbs Also See for Storion-SMILE5:
Table of Contents

Advertisement

Your Smart Energy
NOTE: Place a cover (paper, foil, etc.) over the battery while drilling into the wall to protect it
from dust. In addition, at the spot of installation, the slope of the ground on a horizontal plane
may not exceed 3° .
Step 5: Remove the debris baffle and secure the battery to the wall with screws and gaskets.
___________________________________________________________________
Page 18
Installation
Figure 14 Battery Installation – Mounting on the Wall
Figure 15 Battery Installation – Second Battery Installation
Alpha ESS Co., Ltd.
M8*60
M6 Gasket

Advertisement

Table of Contents
loading

Table of Contents