Meter Sm60A (If Applicable); Acr10R Meter (If Applicable) - Alpha ESS SMILE5 Installation Manual

Table of Contents

Advertisement

INSTALLATION
Note:
If the ADL3000 meter with CT is used as a grid meter, the direction of arrow in CT
should point away from the grid to the energy storage system.
If the ADL3000 meter with CT is used as a PV meter in AC- or hybrid-coupled system,
the direction of arrow in CT should point away from the PV inverter to the energy
storage system.

2.3.2 Meter SM60A (If Applicable)

2.3.2.1 SM60A connect (with meter plug), if applicable:
LAN1
METER
DRMs
LAN2
BAT
BACK-UP
GRID
G L
N G L
N
PE
Figure 40 SM60A connect (with meter plug)
2.3.2.2 SM60A connect (without meter plug), if applicable:
LAN1
METER
DRMs
LAN2
BAT
BACK-UP
GRID
G L
N G L
N
PE
Figure 41 SM60A connect (without meter plug)
Note: Connect the power meter (PIN 5, 6) to the meter port of the cable box (PIN 3, 6)
using the RJ45 cable.
For AC/Hybrid system, there are two meter needed:
RJ45
Plug2
5 6 7 8
GRID
LOAD
L L' N N'
6
RJ45
RS485
3
5 6 7 8
GRID
LOAD
L L' N N'
26
27
Option 1: with Meter Plug
Plug1
Figure 42 Two Meter Connect,
with Meter Plug

2.3.3 ACR10R Meter (If Applicable)

2.3.3.1 ACR10R single-phase connection
BACK-UP
GRID
G L
N G L
N
PE
Figure 44 ACR10R single-phase connection (if applicable)
2.3.3.2 ACR10R three-phase connection
BACK-UP
GRID
G L
N G L
N
PE
Figure 45 CT meter three-phase connection (if applicable)
Note: Connect the power meter (PIN 21, 22) to the meter port of the cable box (PIN 3,
6) using the RJ45 cable.
Option 2: without Meter Plug
Cabinet
AlphaESS
RS485 PIN
Plug2
Figure 43 Two Meter Connect, without
6
RJ45
RS485
3
LAN1
METER
DRMs
LAN2
BAT
Grid CT
LOAD
6
RJ45
RS485
3
LAN1
METER
DRMs
LAN2
BAT
Grid CT
LOAD
INSTALLATION
Meter1
Meter2
Grid Meter
PV Meter
RS485 PORT
RS485 PORT
3
6
5
6
5
6
Meter Plug
GRID
Grid Meter
GRID
Grid Meter

Advertisement