Alpha ESS Storion-SMILE5 Installation, Operation & Maintenance Manual page 25

Energy storage system
Table of Contents

Advertisement

Your Smart Energy
Installation
Figure 24 PV Wiring
Step 15: Close the battery front covers and connect the PV-MC4 connectors to the system
(connect on both sides). Connect all AC cables to the distribution box, the meter
communications cable to the meter COM port, and the ethernet cable to the router. Then close
the cable box front cover.
The installation is now complete.
Figure 25 DIP Operation
Step 16: Open the front cover of the last battery and remove the DIP cover. Now set the DIP
switch 2 to "on" mode and close the cover again.
1. If there is
only one
BAT, the DIP switch of this BAT must be set as the following:
___________________________________________________________________
Alpha ESS Co., Ltd.
Page 23

Advertisement

Table of Contents
loading

Table of Contents