Fastening the panels to
the foundation
861-9601.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • Revision 11
➭ Bolted joint an the front of the panels: Bolt the small panel links at the top and bottom in
the fixed-mounted panel together with the front part of the frame at the panel to be lined
up. Thread the upper panel link through the slot of the front support. Use 2 cup head
bolts M10x20, plain washers and hexagon nuts for each small panel link
(tightening torque: 40 Nm).
Fig. 70:
Bolted joint at the frame,
executed on site (detail view)
➭ Bolted joint an the rear of the panels: Bolt the large panel link in the fixed-mounted panel
together with the rear part of the frame at the panel to be lined up.
Use 2 cup head bolts M10x20, plain washers and hexagon nuts for the large panel link
(tightening torque: 40 Nm).
➭ Fasten the panels to the foundation (see page 43, "Constructional data of the foundation").
➭ The fixing material is not included in the scope of supply.
21.5

Mounting the cable bracket

If the circuit-breaker switchgear has been delivered with cable brackets, execute the following
assembly operations:
➭ Mount the cable bracket ③ at the cross members down at the frame.
Fig. 71:
Mounting the cable bracket
Front part of the frame
at the fixed-mounted panel
Front part of the frame
at the panel to be lined up
Front support
Small panel link, bottom
Cross member,
rear
Cross member,
front
Cable bracket
Installation
77/214