Table Of Contents - Siemens 8DA10 Series Installation And Operating Instructions Manual

Medium-voltage switchgear
Hide thumbs Also See for 8DA10 Series:
Table of Contents

Advertisement

Contents
Safety instructions ............................................. 6
1
Signal terms and definitions ............................... 6
2
General instructions ........................................... 7
3
IT security .......................................................... 9
4
Due application .................................................. 9
5
Qualified personnel .......................................... 10
Description ....................................................... 11
6
Panel overview................................................. 11
6.1
Subframe ......................................................... 11
6.2
Switchpanel pole.............................................. 11
6.3
Examples for panel versions ............................. 12
6.4
Examples for panel versions ............................. 13
6.5
Low-voltage compartment ............................... 15
7
Circuit-breaker ................................................. 16
7.1
Design ............................................................. 16
7.2
7.3
Equipment ....................................................... 17
8
Three-position disconnector ............................. 18
9
Make-proof busbar earthing switch .................. 20
10
Current and voltage transformers ..................... 21
10.2 Current transformers ........................................ 23
11
Gas compartments ........................................... 24
12
Panel connection.............................................. 25
12.1 Features........................................................... 25
13
Protection and control equipment .................... 27
14
Voltage detecting systems ................................ 27
15
Aseismic design (option) .................................. 28
16
Accessories ...................................................... 29
16.1 Standard accessories ........................................ 29
16.2 Other accessories ............................................. 30
17
Technical data .................................................. 31
17.1 Electrical data................................................... 31
17.2 Vacuum circuit-breaker..................................... 32
17.3 Endurance classes ............................................ 34
17.4 Insulating gas................................................... 35
IEC 62 271-200 ................................................ 37
17.7 Phase sequence................................................ 38
17.8 Rating plates .................................................... 39
861-9601.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • Revision 11
Installation........................................................ 40
18
Constructional stipulations ............................... 40
18.1 Switchgear room.............................................. 40
18.3 Transport units................................................. 45
19
Before installation ............................................ 46
19.1 Preliminary clarifications................................... 46
19.2 Installation and fixing material ......................... 46
19.3 Working materials ............................................ 46
with desiccant bags.......................................... 47
19.5 Tightening torques........................................... 48
20
Transport and storage ...................................... 50
20.1 Packing and transport unit................................ 50
20.3 Intermediate storage ........................................ 50
the transport unit ............................................. 53
at the place of installation ................................ 56
20.6 Aligning the switchgear.................................... 59
20.7 Checking the SF6 gas pressure.......................... 60
21
Switchgear installation ..................................... 61
21.1 Preparing busbar assembly ............................... 62
21.2 Lining up panels ............................................... 71
21.3 Lining up further panels ................................... 74
21.5 Mounting the cable bracket .............................. 77
21.6 Installing the earthing busbar ........................... 79
(twin busbar) ................................................... 84
22
commissioning................................................. 95
with SF6 gas .................................................... 95
in the accessories, and filling
housings with SF6 gas .................................... 103
23
voltage test .................................................... 105
24
3/214

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents