Siemens 8DA10 Series Installation And Operating Instructions Manual page 146

Medium-voltage switchgear
Hide thumbs Also See for 8DA10 Series:
Table of Contents

Advertisement

Installation
146/214
Fig. 179: Fixing points for long air guide
➭ Mount lower end wall.
Fig. 180: Fixing points for lower end wall
➭ Fasten the upper end wall with 22 self-tapping bolts.
Fig. 181: Fixing points for upper end wall
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
Front end cover
Long air guide
Rear end cover
Self-tapping bolts
M6x16 (16x)
Close the holes with
sealing stoppers (6x)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents