Installation With Mounting Rail; Mounting Position, Mounting Dimensions - Siemens SIMATIC Distributed I/O ET 200eco PN Operating Instructions Manual

Hide thumbs Also See for SIMATIC Distributed I/O ET 200eco PN:
Table of Contents

Advertisement

Installing

2.3 Mounting position, mounting dimensions

2.2

Installation with mounting rail

Version
The mounting rail is available with a length of 500 mm.
Installing the mounting rail
Cut the 500-mm rail to suit your requirements and drill mounting holes for the M8 screws.
You should distribute the mounting holes evenly at a pitch of 182 mm on the rail, starting at
a distance of 12 mm from the edge.
Use the rack screw to bolt the I/O devices onto the mounting rail.
Figure 2-4  Installing the mounting rail
2.3
Mounting position, mounting dimensions
Mounting position
The ET 200eco PN can be mounted in any position.
Mounting and clearance dimensions
Table 2-1  Mounting dimensions
Mounting width
Mounting height
Mounting depth
24
Dimensions
single width
30 mm
200 mm
49 mm
double width
60 mm
175 mm
49 mm
Operating Instructions, 06/2022, A5E01250250-AN
ET 200eco PN

Advertisement

Table of Contents
loading

Table of Contents