Operation
162/214
1
Initial situation
3
➭
Push the control gate to the right.
5
➭
Remove the operating lever for the READY-TO-
EARTH function.
The interrogation lever and the control gate return to
their initial position.
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
2
➭
Push the interrogation lever downwards.
4
➭
Switch the three-position disconnector to READY-
TO-EARTH position (insert the operating lever for
the READY-TO-EARTH function and turn 180°
clockwise).
6
➭
Close the circuit-breaker to earth the feeder.
➭
Padlock the "feeder earthed" locking device.