Switching Operations In Top-Mounted Bus Sectionalizer (Without Additional Panel) - Siemens 8DA10 Series Installation And Operating Instructions Manual

Medium-voltage switchgear
Hide thumbs Also See for 8DA10 Series:
Table of Contents

Advertisement

Operation
1
Initial situation
3
Switch the left-hand three-position disconnector to CLOSED position
(insert the operating lever for the DISCONNECTING function and turn
180° clockwise).
5
Push the right-hand control gate to the left.
7
Remove the operating lever for the DISCONNECTING function.
The right-hand control gate returns to its initial position.
176/214
37.3
Switching operations in top-mounted bus sectionalizer
(without additional panel)
Coupling busbar sections
Revision 11 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DA10 • 861-9601.9
2
Push the left-hand control gate to the left.
4
Remove the operating lever for the DISCONNECTING function.
The left-hand control gate returns to its initial position.
6
Switch the right-hand three-position disconnector to CLOSED position
(insert the operating lever for the DISCONNECTING function and turn
180° clockwise).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents