Commissioning; Function Check; Switching On The Measuring Device - Endress+Hauser Fieldbus Levelflex M FMP43 Operating Instructions Manual

Guided level-radar
Hide thumbs Also See for Fieldbus Levelflex M FMP43:
Table of Contents

Advertisement

Levelflex M FMP43 with FOUNDATION Fieldbus
ENDRESS + HAUSER
+
E
Endress+Hauser
6

Commissioning

6.1

Function check

Make sure that all final checks have been completed before you start up your measuring point:
• "Post-installation check" checklist (→ ä 22).
• "Post-connection check" checklist (→ ä 30).
6.2

Switching on the measuring device

When the device is switched on for the first time, the following messages appear on the display:
After 5 s, the following message appears
After 5 s, the following message appears (e.g. on HART
devices)
After 5 s or after you have pressed
message appears
Select the language
(this message appears the first time the device is switched
on)
Select the basic unit
(this message appears the first time the device is switched
on)
The current measured value is displayed
F
After pressing
, you are taken to the group selection.
This selection enables you to perform the basic setup
Commissioning
F
the following
55

Advertisement

Table of Contents
loading

Table of Contents