Center Frame Assembly 2112-09-11 - Landoll Coulter Chisel 2112 Operator's Manual

Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS
Center Frame Assembly
2112-09-11
Do not attempt to lift heavy parts (such as the
frame, coulter gangs, wheel lift, and pull hitch)
manually. Use a hoist or a forklift to move these
parts into position.
IMPORTANT
Read all safety precautions at the front of the section
before attempting any of the following procedures.
1. Place center frame assembly on stands
approximately 36" high. The assembly area should
be a large level area of sufficient size to
accommodate the Coulter Chisel when fully
assembled.
2. Remove any shank assemblies or extensions that
may have been turned around or mounted inside the
frame for shipping, and reposition,
through
See Figures 2-9
SPECIFICATION" section for shank placement.
3. Install the 340/65 R18 tire/wheel assemblies to all
hub/spindle assemblies using 5/8 wheel nuts,
Figures
3-2. Torque to 85-100 ft/lbs.
NOTE
The valve stems will face outwards.
4. Install the 2112 front manifold assembly on 2 hole
plate on front of center frame tube using 1/2 x 4 bolt
and 1/2 lock nut.
3-2
WARNING
See Figures 2-4
in "STANDARD
5. Attach smv mount, manifold mount to rear tube of
center frame with 5/8 x 6 bolts and 5/8 lock nuts.
6. Install the smv, SIS decal bracket to smv mount with
1/4 x 1 bolts and 1/4 lock nuts. Install the SIS 20mph
decal in location shown
SIS 20 MPH
DECAL
Figure 3-1: SIS 20mph Decal Installation
7. Install the 8 port manifold assembly for optional
hydraulic reel attachment on manifold mount using
See
1/2 x 3-1/2 bolts and 1/2 lock nuts.
See Figures
3-1.
SIS 20 MPH
DECAL
LOCATION
SIS DECAL
MOUNT
F-1102-0721

Advertisement

Table of Contents
loading

Table of Contents