ASSEMBLY INSTRUCTIONS
4 FOOT
Figure 3-37: 1,200 Foot-Pounds of Torque
Final Assembly
1. Attach a tractor to the implement and charge the lift
system hydraulics as described in
System" on page
4-3.
2. Install the 2 x 16 transport lockouts on both 4 x 16
cylinders on the center frame.
3. Connect lights to the tractor and verify operation.
4. Check tires for proper inflation
5. Level the Wing Coulter Chisel from front to rear as
described in
"Leveling (Front-to-Rear)" on
page
4-5.
3-48
6. Inspect the final implement assembly, and verify that
300
POUNDS
PULL
7. Rotate each coulter gang to verify that each gang
8. Lubricate the Wing Coulter Chisel at all locations as
9. Touch up with paint any areas that may have been
10. Thoroughly read and understand the operating
"Hydraulic Lift
all bolts have been tightened, cotter pins spread, and
that there are no leaking hydraulic connections.
CAUTION
Tighten all 1-3/4" nuts to 1,250 foot-pounds of
torque
(See Figure
3-37)
rotates freely. Adjust any scrapers that may have
shifted during shipment or assembly.
described in
"Lubrication Maintenance" on
page
4-11.
scratched during moving, handling, or assembly.
section before using the Coulter Chisel.
F-1102-0721