Figure 4: Front Panel Of The At-Ie200-6Gp Switch; Figure 5: Top Panel - Allied Telesis IE200 Series Installation Manual

Industrial ethernet switches
Hide thumbs Also See for IE200 Series:
Table of Contents

Advertisement

The front panel of the AT-IE200-6GP Switch is shown in Figure 4.
Status LEDs
Reset button
Console
management
port
Figure 5 identifies the components on the top panel.
Alarm In
connector
Alarm Out
connector
Figure 4. Front Panel of the AT-IE200-6GP Switch
Figure 5. Top Panel
IE200 Series Installation Guide
Four 10/100/1000Base-T
twisted pair ports with PoE
and PoE+
Two slots for
100/1000Base-FX SFP
transceivers
USB port
PWR 1 DC
power connector
PWR 2 DC
power connector
Grounding screw
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie200-6ftAt-ie200-6fpAt-ie200-6gtAt-ie200-6gp

Table of Contents