Chapter 5: Powering On The Switch - Allied Telesis IE200 Series Installation Manual

Industrial ethernet switches
Hide thumbs Also See for IE200 Series:
Table of Contents

Advertisement

Chapter 5
Powering On the Switch
This chapter contains the following procedures:
"Connecting the Grounding Wire" on page 80
"Wiring the ALM IN and ALM OUT Connectors" on page 83
"Preparing the DC Power Cables" on page 88
"Powering On the Switch" on page 92
"Monitoring the Initialization Process" on page 94
"Starting a Local Management Session" on page 96
"Installing the Optional Drip Guard" on page 99
79

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-ie200-6ftAt-ie200-6fpAt-ie200-6gtAt-ie200-6gp

Table of Contents