Huawei SmartDC V100R021C10 User Manual page 235

Data center controller
Hide thumbs Also See for SmartDC V100R021C10:
Table of Contents

Advertisement

ECC800 Data Center Controller
User Manual
Figure 6-82 High-density island solution
Step 4 Go to the linkage control page and check that Enable linkage control function is
set to Yes. Set the linkage control signals in the high-density island scenario to on.
Figure 6-83 Setting linkage control in the high-density island scenario
Step 5 Modify the AI/DI_1 signal name.
1.
2.
3.
Step 6 Enable the AI/DI device.
1.
2.
3.
4.
----End
Issue 04 (2021-10-09)
Choose System Settings > Signal Name Modify. The Batch Signal
Configuration page is displayed.
Set Device type to ECC800, set Device name to ECC800, and click OK.
On the query result tab page, set the new signal name of AI/DI_1 to Smoke
and click Submit.
Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_1
Port Settings.
Set Smoke sensor to Enable and click Submit.
Confirm that Smoke sensor type is automatically identified as Smoke sensor
or Smoke sensor(NC).
Click Unhide All Advanced Signals, and click Power Supply Parameters.
Ensure that III power supply enable(AIDI_1/DO) is Enable.
Copyright © Huawei Technologies Co., Ltd.
6 Feature Description
223

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ecc800

Table of Contents