Completing The Installation; Completing The Installation Of A New System - Enterasys Matrix 7G4282-41 Hardware Installation Manual

Dfe-platinum series
Hide thumbs Also See for Matrix 7G4282-41:
Table of Contents

Advertisement

Modem Port Adapter Wiring and Signal Diagram
RJ45
Pin
1
2
4
5
6
8

COMPLETING THE INSTALLATION

Completing the DFE module installation depends on if the module is being installed in:
a new DFE module system (refer to "Completing the Installation" on page 3‐21), or
an established, operating DFE module system (refer to "Completing the Installation of 
a DFE‐Platinum Module in an Existing System" on page 3‐23).

Completing the Installation of a New System

In a new system of DFE modules, one of the installed DFE modules will become the 
management module on chassis power up, and all DFE modules will automatically be set 
to the factory default values. A complete list of the factory default values are provided in 
Chapter 3 of the Enterasys Matrix DFE‐Platinum Series Configuration Guide.
After installing all DFE‐Platinum modules into the host chassis and making the 
connections to the network, proceed to the following First‐Time Log‐In Using a Console 
Port Connection procedure to access the module management startup screen from your 
PC, terminal, or modem connection.
DB25
Conductor
Pin
Blue
2
Orange
8
Red
3
Green
7
Yellow
20
Gray
22
Enterasys Matrix DFE-Platinum Series Hardware Installation Guide
Completing the Installation
Signal
Transmit (TX)
Data Carrier Detect (DCD)
Receive
Ground (GRD)
Data Terminal Ready (DTR)
Ring Indicator
3-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Matrix 7g4202-60

Table of Contents