Responsibility Of The Operator; General Hazard - Ametek AMP 200N Manual For Operation

Low frequency signal source for supply simulation and magnetic fields
Table of Contents

Advertisement

AMETEK CTS
To avoid personal injury, do not operate the generators without panels and covers.
Do Not Operate in an Explosive Environment
Electric Overload
Never apply power to a connector which is not specified for that particular voltage/current.
1.3

Responsibility of the operator

These operating instructions form an essential part of the equipment and must be available to the operator at all
times. The user must obey all safety instructions and warnings.
The purpose of this instrument is the generation of defined interferences signals for EMI
immunity testing. Depending on the arrangement of the test rig, the configuration, the
cabling and the properties of the EUT itself, a significant amount of electromagnetic
radiation may result that could also affect other equipment and systems.
The equipment is designed to operate in industrial environment. For operating in other or
sensitive environment, such as light industry, airport area..., the user may use a shielded
room for operate.
WARNING
The user himself or herself is ultimately responsible for the correct and controlled operation
of the rig. In case of doubt, the tests should be carried out in a Faraday cage.
1.4

General hazard

Before applying power to the system, verify that your product is configured properly for your application.
The generators and their accessories operate at high voltages.
Hazardous voltages may be present when covers are removed. Qualified personnel must
use extreme caution when servicing this equipment.
Circuit boards, test points, and output voltages also may be floating above (below) chassis
ground.
WARNING
The design of external insulation must be such that it exceeds the maximum voltages of the
device.
Risk of electrical shock by touching the output plugs
WARNING
Only qualified personnel who deal with attendant hazards in impulse generators, are allowed to perform
installation and servicing.
Ensure that the AC power line ground is connected properly to the Power Rack input connector or chassis.
Similarly, other power ground lines including those to application and maintenance equipment must be grounded
properly for both personnel and equipment safety.
Always ensure that facility AC input power is de-energized prior to connecting or disconnecting any cable.
The user must ensure that the output power lines are labeled properly as to the safety hazards and that any
inadvertent contact with hazardous voltages is eliminated.
Guard against risks of electrical shock during open cover checks by not touching any portion of the electrical
circuits. Even when power is off, capacitors may retain an electrical charge. Use safety glasses during open
cover checks to avoid personal injury by any sudden component failure.
Manual for Operation
V 4.0.3
AMP 200N series
6 / 60