Operating Functions Amp200N1.1 And Amp 200N2; Front View - Ametek AMP 200N Manual For Operation

Low frequency signal source for supply simulation and magnetic fields
Table of Contents

Advertisement

AMETEK CTS
5

Operating Functions AMP200N1.1 and AMP 200N2

5.1

Front view

1. TEST ON
2. LED Power
3. LED Fail
4. Measuring input
5. Measuring input enabled
1
Test ON
Test On button for enable the output of the amplifier. The input signal of the amplifier will be grounded.
The test ON button can be switch on after power up (the power LED is on, no blinking).
2
LED Power
Power On Indication of the present mains power. The illuminated LED shows the power on status.
3
LED Fail
Indication of different Fail status of the AMP 200N, such as:
Overtemperature, Overload, internal Fail, Safety Circuit
Fail Reset: Press OK in the software Fail window, wait 2 seconds and press AMP200N Test ON button.
4
Measuring Input
Measuring input of the frequency selected voltmeter.
Input range: Max. 200V pk-pk;
5
Measuring input indication
LED indication for active measurement.
6
2 wire output indication
LED indication for use the 2-wire output plugs (Flashing).
7
2 wire output
Output 4mm banana plugs for the signal from the amplifier. (The 2-wire and coaxial outputs are always in
parallel).
LED indication for use the coaxial output. (Flashing).
Manual for Operation
Figure 3
6. 2 wire output indication
7. 2 wire output
8. Coaxial output
9. Coaxial output indication
10. Current clamp input enabled
11. Current clamp input
Frequency range: 10Hz to 250kHz
V 4.0.3
AMP 200N series
14 / 60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amp 200n1.1Amp 200n2Amp 200n1

Table of Contents