AMETEK CTS
12.4
Setup for Ford EMC CS 2009-1
These requirements are related to component immunity from wire-to wire coupling of unintended transient
disturbances. The originate of these disturbances are from switching of inductive loads including solenoids and
motors.
Standard setup as per Ford
For complete transient testing as
per Ford standard, the following
setup shows the wiring between
the different EM Test devices.
Manual for Operation
Rack 1 DC sources
RDS 200
RDS 200
RDS200
AMP 200N
AutoWave
PFS 200N
VDS 200N
Figure 13 Setup 7
V 4.0.3
Rack 2 Pulses
LD 200N
UCS 200N
AMP 200N series
33 / 60