Ci 250 Pulse Verification - Ametek AMP 200N Manual For Operation

Low frequency signal source for supply simulation and magnetic fields
Table of Contents

Advertisement

AMETEK CTS
13.2

CI 250 Pulse verification

CI 250 Test Parameter requirements
Peak measurement
Un
Upeak
U1
5.00
U2
3.65
U3
2.67
U4
1.95
U5
1.42
U6
1.04
U7
0.76
U8
0.55
U9
0.41
U10
0.30
Tolerances:
Time interval
± 10%
Voltage
+10% -0%
Climatic Test conditions
Temperature
23± 5.0 degrees C
Humidity
20 to 80% relative humidity (RH)
Manual for Operation
V 4.0.3
AMP 200N series
58 / 60

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Amp 200n1.1Amp 200n2Amp 200n1

Table of Contents