9.2.2 Maintenance Table: Daily Maintenance

At Beginning
Instrument/Component
of Day
DiTi cones (LiHa)
Air displacement
pipetting arm (Air LiHa)
RoMa
During Day
Instrument/Component
DiTi waste bag
At End of Day
Instrument/Component
Air displacement
pipetting arm (Air LiHa)
Carriers and racks
Worktable
Safety panel
DiTi waste bag
DiTi waste slide and waste station unit
Lower DiTi eject option
RoMa standard

9.2.3 Maintenance Table: Weekly Maintenance

Daily
Maintenance
Instrument/Component
Air displacement
pipetting arm (Air LiHa)
PyroTec™ PRO Hardw are User's Manual, V1.2
Maintenance Task
Clean
Check for deposits
Tighten
Adjustment check
Clean and inspect DiTi cones
Visually check grippers for deformities and damage
Maintenance Task
Check and change when it is full
Maintenance Task
Clean and inspect DiTi cones
Clean using a detergent or antiseptic solution
Clean
Clean
Change
Clean
Clean rocker
Clean gripper fingers using alcohol or acetone
Daily maintenance
Maintenance Task
Perform the following tests:
• Instrument Warm-up
Return to TOC
Reference
See PyroTec™ PRO Software
User Guide
RT-MN024-1.2 02/21
85

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PyroTec PRO and is the answer not in the manual?

Table of Contents