PyroTec™ PRO utilizes a fixed deck layout. The carriers should be used in the same position
Positioning
where they are left during installation.
Barcode
Barcodes on the carriers and on most of the individual containers can be identified.
Identification

6 Installation

This chapter describes:
Purpose of
How to prepare the site for installation of the PyroTec™ PRO instrument
This Chapter

6.1 Site and System Preparation

Site
Verify the installation site against the general site requirements.
Requirements
Describe any modifications needed.
Date of
Determine the date of delivery.
Delivery

6.1.1 Site Requirements

Delivery Route Take the following points into consideration with regard to transport of the instrument
within a site:
Loading platform
Load capacity of elevator
Minimum size of elevator
Doors and entryway openings
Passageway corners
Space
Is there
Check the size of the room where the instrument will be installed:
enough space
for all of the
Enough space to place instrument, cabinet, and extensions?
components
Enough space to open doors of instrument and cabinet?
Enough walking space around the instrument?
Space for placing system liquid/waste containers?
Space for the control computer?
Minimum space between instrument and wall:
10 cm/ 4 in.
PyroTec™ PRO Hardw are User's Manual, V1.2
Is there a loading platform or similar de-
vice?
Is it suitable for unloading the instrument
from a truck?
At least 400 kg / 882 lbs.
According to instrument size
Wider than 940 mm / 37 in.
Are the passageways wide enough to
transport the instrument around corners?
Return to TOC
48
RT-MN024-1.2 02/21