Mixing pump G 4 X FU 230/400V Overview - Operation
Maintenance
51.5.5 Setting value pressure switch air
Fig. 113: Pressure switch air
51.5.6 Setting value pressure switch air compressor
51.6 Adjust locking lever
1
Fig. 114: Eccentric bushing
51.7 Measures after effected maintenance
66
Air
Compressor
2
3
Loosen locking lever and turn eccentric bushing.
Close the locking lever and check if this action closes the
mixing tube again tightly.
1. After finishing the maintenance works and prior to switching on
the machine, the following steps have to be carried out:
2. Check all previously loosened screw connections for secure fit.
3. Check if all previously removed safety systems and covers are
properly reinstalled.
4. Ensure that all used tools, materials and other equipments were
removed from the work area.
Switching on the
machine
0.9 bar
Switch on air
compressor
2.5 bar
NOTE!
By turning the eccentric bushing (1) with the special
wrench (2) in the tool bag, the locking lever (3) can be
adjusted.
Switching off the
machine
1.2 bar
Switch off air
compressor
3.1 bar
2020-01-07