Transport; Transport With Van - PFT G 4 X FU Series Operating Manual

Mixing pump 230/400v
Hide thumbs Also See for G 4 X FU Series:
Table of Contents

Advertisement

Mixing pump G 4 X FU 230/400V Overview - Operation
Transport, packing and storage

23.3 Transport

Anchor points
Fig. 31: Anchor points

23.4 Transport with van

Fig. 32: Transport
Transport of already running
machine
28
Anchor the machine at the anchor points with a rope for transport
by crane.
Observe the following conditions:
The crane and lifting equipment have to be designed for the
weight of the packages.
The operator has to be authorised to operate the crane.
Attachment:
1. Anchor hooks in accordance with to both crane hooks.
2. Ensure that the package is straight, possibly observe eccentric
centre of gravity.
1. Remove the water hose form the mixing tube.
2. Loosen the locking lever and lift the mixing tube.
3. Insert the hook of the protective grille at the motor protection
handle.
4. Lock the castors of the machine.
DANGER!
Danger of injury by unsecured loads!
In case of road transport, all persons involved in
the loading process are responsible for the proper
securing of the load. The responsible driver is
responsible for the operational loading.
DANGER!
Risk of injury from discharged mortar!
Injuries to face and eyes can occur.
Therefore:
Before opening the couplings ensure that there is
no more pressure on the hoses (observe display
at mortar pressure gauge).
1. Carry out the following steps before beginning the transport:
2. First unplug the mains cable.
3. Unplug all other cable connections.
4. Remove water supply line.
5. Remove loose parts, e.g. compressor prior to transport by
crane.
6. Start transport.
2020-01-07