Switching On The G 4 X (400V); Putting The Machine Into Operation (400V); Set Water Quantity - PFT G 4 X FU Series Operating Manual

Mixing pump 230/400v
Hide thumbs Also See for G 4 X FU Series:
Table of Contents

Advertisement

Mixing pump G 4 X FU 230/400V Overview - Operation

Switching on the G 4 X (400V)

29 Switching on the G 4 X (400V)

29.1 Putting the machine into operation (400V)

2
4
Fig. 44: Switching on

29.2 Set water quantity

Fig. 45: Water supply button
Fig. 46: Water supply button
34
1. Turn main switch (1) to position "I".
1
2. Press the green push button (2) control voltage "ON" (only for
400V).
5
3. Pilot lamp operation 400V (3) lights up.
4. If the yellow pilot lamp "change direction of rotation" (4) lights
up, change the direction of rotation.
3
5. Turn main switch (1) to position "0".
6. Push the metal bracket (5) in the opposite direction.
7. Turn main switch (1) to position "I".
NOTE!
The machine starts up only, if the yellow pilot lamp
does not light up.
1
1. Press the water supply button (1) to adjust the water quantity.
2. At the same time adjust the expected amount of water required
at the needle valve (2).
3. The water flow can be seen at the inspection glass (3) of the
3
water flow meter and the level of the floater (4).
4
NOTE!
The specifications of the material manufacturer are
to be observed here, e.g. Knauf MR75 water
consumption approx. 650l/h
2
NOTE!
Any interruption of the spray operation results in a
slight irregularity in the consistency of the material.
This irregularity normalises by itself as soon as the
machine has been working for a short while.
Therefore it is important not to change the water
quantity for each irregularity.
consistency of the material has set again.
Wait until the
2020-01-07