Mixing pump G 4 X FU 230/400V Overview - Operation
Maintenance

51.4 Maintenance plan

Interval

Maintenance work

monthly
Clean/replace filter of compressor.
monthly
Clean/replace plastic sieve in strainer.
monthly
Clean/replace strainer screen in pressure reducer.
51.5 Maintenance work
51.5.1 Air filter compressor
Fig. 109: Filter frame
64
The following paragraphs describe the maintenance works that are
require for an ideal and trouble-free operation.
In the event that increased wear is detected during regular checks,
the required maintenance intervals have to be shortened according
to the actual signs of wear.
Should you have any queries regarding maintenance works and
intervals contact the manufacturer, see page 2 for service
addresses.
NOTE!
Maintenance is limited to a few checks. Thorough
cleaning after use is the most important
maintenance.
Execution by service technician.
1. Remove covers (5.0 and 6.0).
2. Take out filter frame (3.0).
3. Blow through the filter from the inside to the outside or tap it.
4. Replace the filter in case of heavy contamination.
5. Insert filter frame and screw back on the covers (5.0 and 6.0).
To be carried out by
Service engineer
Operator
Service engineer
2020-01-07