Preparing The Machine; Connecting The Power Supply 400V - PFT G 4 X FU Series Operating Manual

Mixing pump 230/400v
Hide thumbs Also See for G 4 X FU Series:
Table of Contents

Advertisement

27 Preparing the machine

1
Fig. 35: Grille cover
Fig. 36: Lockable castor

28 Connecting the power supply 400V

1
Fig. 37: Connect power supply 400V
2020-01-07
Mixing pump G 4 X FU 230/400V Overview - Operation
Prior to operating the machine carry out the following steps for
preparing the machine:
DANGER!
Running star wheel!
Risk of injury when reaching into the running star
wheel.
During machine preparation and operation the
grille cover (1) must not be removed.
Never reach into the running machine.
1. Lock the lockable castor prior to operating the machine.
2. Put up the machine on a stable, even surface and secure
against unwanted movements:
Neither tilts nor rolls off the machine.
Put up the machine in such a way that it cannot be hit by
falling objects.
The operating elements have to be freely accessible.
Maintain a clearance of approx. 1.5 metres around the
machine.
1. Connect machine (1) to three-phase network 400V.
NOTE!
The machine can be switched to 230V 1 phase and
operated, although it is connected to a 400V / 3-
phase supply (see page 16, fig.
Advantage: The motor speed can be controlled via
the potentiometer.
Disadvantage: As the machine is controlled via the
frequency converter, the gear motor no longer
reaches its full capacity (maximum 4 kW).
DANGER!
Danger of death from electric current!
The connection line has to be fused properly:
Connect the machine only to a power supply
with permissible RCCB 30 mA RCD (residual
current operated device) type "B" all-current
sensitive
converters.
15:).
for
operation
of
frequency
31