On-Site Installation; Pre-Installation Procedure - ABB Feather Duster V2 Product Manual

Table of Contents

Advertisement

3.3 On-site installation

3.3.1 Pre-installation procedure

Robot position
The robot must be positioned as shown in the following figure. The flange surface
of axis 6 must be horizontal.
xx1800001268
Product manual - Feather Duster V2
3HAX010000210 Revision: A
© Copyright 2018 ABB. All rights reserved.
3 Installation and commissioning
3.3.1 Pre-installation procedure
Continues on next page
51

Advertisement

Table of Contents
loading

Table of Contents