5.1
Before initial start-up
Pos: 42.8 /BA/Erstinbetriebnahme/Rundballenpresse/Vorbereitungen Erstinbetriebnahme @ 226\mod_1392643174796_78.docx @ 1824323 @ @ 1
For reasons related to transport, the machine is delivered without the PTO shaft and bale
ejector. Before initial start-up, the machine must be completely assembled and adjusted to the
tractor type.
The following parts are included loose with delivery in some cases.
Pos: 42.9 /BA/Erstinbetriebnahme/Rundballenpresse/Teile Erstinbetriebnahme_Comprima CF/CV @ 298\mod_1412840255658_78.docx @ 2337402 @ @ 1
Fig. 22
Pos.
1
2
3
4
5
6
7
without fig.
without fig.
without fig.
Pos: 42.10 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1
1
3
5
Designation
Can of spray paint
Universal shaft
Universal shaft support
Hose support and cable support
Fastening material
Power supply on the tractor
Universal shaft bracket for Comprima CV 210
Control unit (depending on the version)
Extension cable
Ring spanner 13
2
7
4
Storage location
Twine box
Wrapping table
Twine box
Bale chamber
Twine box
Twine box
Twine box
Twine box
Twine box
Twine box
Commissioning
6
CP100050_3
57