High-Pressure Gas Purging With Parting Agent Program Sequence (1St Contact Tip) - Fronius Robacta TSS /i Operating Instructions Manual

Welding torch cleaning
Table of Contents

Advertisement

High-pressure
Move to position D
gas purging with
approx. 50 mm/1.97 in. centrally above
parting agent
the opening for the high-pressure gas
program
purging
sequence (1st
Contact tip 1 vertical to the service sta-
contact tip)
tion
Speed: High-speed mode
Set
external signal "Pump for parting agent"
Reset
external signal "Pump for parting agent"
Move into the high-pressure gas pur-
ging
max. speed: 50 cm/min / 19.69 ipm
Select insertion depth so that the dis-
tance between contact tip and nozzle is
3 mm / 0.12 in.
Set
external signal "External valve brush
cleaning"
Set
external signal "High-end gas purging
(from front)"
74
1
Wait 0.2-0.3
seconds
specification of the
parting agent
volume via the dur-
ation
Wait 0.5 - 1.5
seconds
D
50 mm
1.97 in.

Advertisement

Table of Contents
loading

Table of Contents