Starting Up The Welding Torch Service Station; General; Opening The Welding Torch Service Station; Requirements For Starting Up - Fronius Robacta TSS /i Operating Instructions Manual

Welding torch cleaning
Table of Contents

Advertisement

Starting Up the Welding Torch Service Station

General

NOTE!
If wetting agent has not been applied to the inside of the welding torch, this may
lead to the permanent contamination of the welding torch when welding begins.
Always wet the inside of the welding torch with the manufacturer's "Robacta Reamer"
parting agent before starting an automatic application.
To achieve optimum cleaning results, observe the following points:
-
-
-
Opening the
If the welding torch service station is equipped with an optional fieldbus as a robot con-
Welding Torch
trol unit connection, the service station for connecting the robot control unit and for fault
Service Station
diagnosis of the fieldbus must be opened as follows:
Requirements for
The following requirements must be met in order to commission the cleaning device:
Starting Up
-
-
-
-
Starting Up the
1
Welding Torch
Service Station
2
3
4
62
Always wet the inside of the welding torch with parting agent
Adhere to the specified cleaning procedures
Adhere to the specified cleaning positions
*
Securely bolt the welding torch service station to the surface
Any available optional equipment installed on the welding torch service station, sup-
plied with compressed air and connected to the grid if necessary
Compressed air supply to the welding torch service station established
Cleaning device connected to the robot control unit
Check whether all optional equipment is correctly connected to the welding torch
service station
Connect welding torch service station to the robot control unit
max. length of the control cable = 30 m
Establish electrical supply to the optional equipment
max. length of the mains cable = 30 m
Establish compressed air supply
max. length of the compressed air supply line = 30 m
Remove collecting tray
1
Remove three TX25 screws on the left
2
Remove three TX25 screws on the
3
right
Remove frame
4
* Position of the bus coupler

Advertisement

Table of Contents
loading

Table of Contents