Check the processor for leaks in the following areas:
(a)
RECIRCULATION PUMP FITTINGS
(b)
REPLENISHER PUMP CHECK VALVES
(c)
TANK FITTINGS
(d)
THERMOWELL ASSEMBLIES
(e)
PLUMBING FIXTURES
(f)
DRAIN VALVES
[6]
Check that the OVERFLOW HOSES are draining water from the TANKS.
[7]
Check that the DEVELOPER REPLENISHMENT HOSE and the FIXER REPLENISHMENT HOSE are
connected to the correct plumbing fittings.
[8]
Check that the correct REPLENISHER PUMP is operating.
Miscellaneous Components Check
[1]
Install the TOP COVER of the processor.
[2]
Check that the—
(a)
DRYER BLOWER MOTOR operates
(b)
WATER SOLENOID operates (Listen for the sound of water entering into the processor.)
(c)
EXHAUST FAN operates.
Display Panel Check
[1]
Check that the green ''Ready'' light on the DISPLAY PANEL illuminates after the processor has been
allowed to warm-up for approximately 15 minutes at 26°C (72°F) ambient conditions and 26°C (72°F)
water temperature.
[2]
Check that the DEVELOPER temperature illuminated on the DISPLAY PANEL is in the operating range
between 35° and 38.3°C (95° and 101°F).
Transport Check
[1]
Feed one sheet of processed 14x17 cm film into the processor to verify that the TRANSPORT SYSTEM
and the REPLENISHER PUMP operate correctly.
Final Steps
[1]
Deenergize the processor by moving the MAIN CIRCUIT BREAKER, CB1, to the ''O'' position.
[2]
Drain the TANKS of water by opening the 2 DRAIN VALVES on the FEED END of the processor.
[3]
Close both DRAIN VALVES.
[4]
Install the 6 ACCESS PANELS.
After the processor has been in regular use for 1 or 2 days, again check all fittings for leaks.
Tighten loose connections as necessary.