Do not install a Seismic Kit until the processor has been positioned against the wall and has been leveled.
A
If the wall around the opening is straight and exactly perpendicular to the floor, this panel may not be
necessary. The wall opening dimensions should match the inside dimensions of the panel opening.
Make sure that the vertical dimension of 122 cm ± 3 mm (48 ± 1/16 in.) for the wall opening is measured
B
from the finished floor.
18
IMPORTANT
Figure 22 New Wall Installation - Feed End
H108_0010DA
636738