Operation; Pre-Analysis Checklist - Agilent Technologies 55B AA User Manual

Spectrometer
Hide thumbs Also See for 55B AA:
Table of Contents

Advertisement

5

Operation

This chapter provides instructions for running your Agilent 55B AA instrument,
including:
It is assumed that the appropriate hardware has been correctly installed and that
you are familiar with the interface.

Pre-analysis checklist

To prepare for analysis:
1
2
3
Agilent 55B AA Spectrometer User's Guide
How to develop methods.
Optimize the system.
Perform measurements and
Print the results.
Check that all the required hardware (including SIPS and printer if necessary)
is correctly installed.
Turn on the instrument and any peripheral accessories.
Ensure the exhaust system is working by testing the extraction system with
lab tissue paper.
Operation
67
69
74
81
86
88
89
90
67

Advertisement

Table of Contents
loading

Table of Contents