3
Overview
Installation checklist
Instrument overview
Instructions for the customer-installable system components are outlined below.
Prior to setting up your system, ensure all the requirements detailed in the AA
Systems Site Preparation Guide are satisfied.
Installation checklist
Before operating the equipment, complete the following tasks:
Connect the system components
Connect the equipment to the power supply, and check the setting of the two
voltage selection switches (see Power, Page 39)
Install the hardware components
Provide a suitable waste vessel
Instrument overview
Use the following labeled picture as a guide when installing the various
components of your Agilent AA system.
Agilent 55B AA Spectrometer User's Guide
Lamps
Nebulizer
Spray chamber
Burner
Sample compartment front panel
Flame shield
Chimney
Overview
37
37
37