Installing the frame 1A, frame EX and frame 1B
13. Temporarily secure the frame 1A, frame EX and frame 1B to the frame 2 (left side) with the two
hexagon PSW bolts.
14. Temporarily secure the stay (320) with the hexagon PSW bolt.
15. Temporarily secure the frame 1A, frame EX and frame 1B to the frame 2 (right side) by repeating
steps 13 and 14.
16. Extend the flexible levelers (S) so that they are vertically grounded.
Stay (320)
Hexagon PSW
bolt (8 x 25)
Stay (320)
Hexagon PSW bolt
(8 x 25)
Frame 1A
Hexagon
PSW bolts
(8 x 25)
Frame EX
Frame 1B
Nuts of flexible levelers (S)
SRX-R515P
Frame 2 (left side)
Hexagon PSW bolt
(8 x 25)
Frame 1A
Frame EX
Frame 1B
Frame 2 (right side)
Stay (320)
Stay (320)
Hexagon
PSW bolt
(8 x 25)
6-5 (E)