Power On the Library

Power on the library from the front of the Base Module.
Gain physical access to the library. When the library is off, the browser-based user
1.
interface is not running, so you cannot power the system on remotely.
Verify the robot is unlocked (if not, see
2.
Ensure that the bottom library module has the floor installed.
3.
Press the power button on the front upper-left of the base.
4.
The library boots and performs an audit.
Related Topics
Audit the Library
During an audit the robot checks each cartridge slot, recording cartridge labels and
locations to create a tape catalog.

Library Startup Sequence

The library follows a specific sequence to verify operations after powering on.
The robot unparks and the hand fully retracts.
1.
The robot determines the order of the modules, starting at the top and moving
2.
down one module at a time.
The wrist sweeps through its full range of motion and the hand moves through the
3.
full track range. The reach mechanism extends and retracts.
The magazines latch.
4.
The library runs a full audit. When the audit completes and all drives are ready, the
5.
library is operational (see

Power Off the Library

There are two methods of powering off the library: controlled and forced.
Controlled Power-Down from the Interface
possible.
Forced Power-Down
when the controlled method does not work.
Unlock the
Monitor an Audit in
Progress).
— Always recommended, if
— Cuts power at the library or rack. Use this method only
Power On the Library
Robot).
Chapter 9
9-2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SL150 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents