Install The Library; Verify The Site Meets Environmental Requirements; Temperature And Humidity Limits Airborne Contaminants Limits - Oracle SL150 Library Manual

Hide thumbs Also See for SL150:
Table of Contents

Advertisement

2

Install the Library

The SL150 library installs into a standard 19-inch rack. You must install the Base
Module first, and then install any Expansion Modules below it.
Note:
These installation instructions use the Sun Rack II (a standard Oracle 19-
inch rack). If your rack is different, use the instructions as a basic guide but
alter the steps accordingly.
Library installation involves the following tasks:

Verify the Site Meets Environmental Requirements

Prepare the Rack
Unpack and Acclimate the Library
Install the Base Module
Install the Expansion Module
Install Power Supplies and Tape Drives
Cable the Library
Unlock the Robot
Apply Power to the Library
Configure the Library After Powering-on for the First Time
Run a Self-Test
Verify the Site Meets Environmental Requirements
Make sure the site meets environmental requirements to prevent equipment damage.
Temperature and Humidity Limits
Airborne Contaminants Limits
Positive Pressurization and Ventilation - Hot Aisle Containment System (HACS)
Electrostatic Discharge
Temperature and Humidity Limits
To increase reliability and prevent equipment damage, maintain the environment
between the recommended temperature and humidity ranges.
Temperature:
2-1