List Of Phase Display (Display Depends On Program) - Siemens LME7 Series Basic Documentation

Burner control
Hide thumbs Also See for LME7 Series:
Table of Contents

Advertisement

Phase number or
3-segment display
and AZL2... display
Standby
OFF
Ph08
Startup
Ph21
Ph22
Ph24
Ph30
Ph36
Ph38
Ph40
Ph42
Ph44
Ph50
oP1
Operation
oP
Shutdown
Ph10
Ph72
Ph74
Valve proving
Ph80
Ph81
Ph82
Ph83
Waiting phases (prevention of startup)
Ph01
Ph02
Ph02
Ph90
Lockout
LOC
Building Technologies
HVAC Products

List of phase display (display depends on program)

LED
Function
Off
Standby, waiting for heat demand
Off
Mains voltage ON / test phase (e.g. detector test)
Yellow
Safety valve ON, air pressure switch test / POC test (timeout / locking
after 5 seconds), actuator opens in low-fire position
Yellow
Fan motor ON or air pressure switch test / stabilization time
Yellow
Actuator opens in high-fire
Yellow
Prepurging
Yellow
Actuator closes in ignition load / low-fire
Yellow blinking
Preignition
Yellow blinking
1st safety time (TSA1) / ignition transformer ON
Green
Safety time (ignition transformer OFF), flame check
Green
Interval: End of safety time and fuel valve 1 (V1) ON
Green
2. safety time (TSA2)
Green
Interval until release of load controller target (analog or 3-position
step input)
Green
Operation, modulating operation
Yellow
Shutdown, actuator opens in low-fire position (homerun)
Yellow
Actuator opens in high-fire position
Yellow
Postpurging
Yellow
Test space evacuating
Yellow
Checking time fuel valve 1
Yellow
Test space filling
Yellow
Checking time fuel valve 2
Red / yellow blinking
Undervoltage
Yellow
Safety loop open
Red / yellow blinking
Extraneous light at burner startup (timeout / locking after 30 seconds)
Pressure switch-min open → safety shutdown
Yellow
Red
Lockout / locking
Basic Documentation LME7...
19 Operation via the AZL2...
74/164
CC1P7105en
13.10.2009

Advertisement

Table of Contents
loading

Table of Contents