List Of Phase Display (Display Depending On Program) - Siemens LME7 Series Manual

Burner
Hide thumbs Also See for LME7 Series:
Table of Contents

Advertisement

Β
Phase number
AZL2 display
Standby
OFF
Ph08
Startup
Ph21
Ph22
Ph24
Ph30
Ph36
Ph38
Ph40
Ph42
Ph44
Ph50
Ph54
Ph54
oP:P1
Operation
oP:xx
oP:P1
oP:P2
Shutdown
Ph10
Ph72
Ph74
Valve proving
Ph80
Ph81
Ph82
Ph83
Waiting phases (start prevention)
Ph01
Ph02
Ph04
Ph90
Non-alterable lockout
LOC
Building Technologies

List of phase display (display depending on program)

Note!
Display depends on program module, see User Documentations!
Function
Standby, waiting for heat request
Power ON / test phase (e.g. detector test)
Safety valve ON, air pressure switch test / POC test (timeout / locking after 5 seconds),
actuator opens in low-fire position / CLOSE position
Fan motor ON and air pressure switch test / settling time
Actuator travels to the prepurge position
Prepurging
Actuator closes until ignition load / low-fire is reached, and
parameter 259.02: Actuator opens to a position > ignition load
Preignition
1st safety time / ignition transformer ON
Safety time (ignition transformer OFF), flame check
Interval: End of safety time and fuel valve 1 ON
Interval: End of safety time and load controller release
Interval: End of safety time and fuel valve 2 ON
2nd safety time
Parameter 259.01: Actuator opens to a position > low-fire
Parameter 260: Actuator closes until low-fire position is reached
Interval to release of preset load controller (analog or 3-position step input)
Operation, modulating operation
Operation first stage
Operation second stage
Actuator travels to the CLOSED position (home run)
Actuator opens until high-fire position / operation shutdown is reached
Postpurging
Test space evacuating
Test atmospheric pressure
Test space filling
Test gas pressure
Undervoltage / overvoltage
Safety shutdown, followed by a non-alterable lockout with interlocking
↑ e.g. safety loop open
Extraneous light on burner startup (timeout / locking after 30 seconds)
Pressure switch-min open
↑ safety shutdown / non-alterable lockout with interlocking
Lockout phase
Basic Documentation LME7...
13 Operation via AZL2
57/106
CC1P7105en
17.04.2018