GE Vivid 3 Pro Service Manual page 136

Hide thumbs Also See for Vivid 3 Pro:
Table of Contents

Advertisement

GE M
S
EDICAL
YSTEMS
D
2300164-100, R
IRECTION
10) Hold the front wall (item 13) vertically against the front of the crate and secure it in place using eight
clips (item 15).
11) Secure the hand lever (clip remover) tool (item 23) to the outside of the wooden crate, using a
screw.
12) Secure the box with two steel strip loops (item 16) around the right and left side walls, and one strip
loop around the front and back walls.
13) Place two shock-watch labels (item 17) and all other labels (items 20 to 25) on the outer sides of
the wooden box.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
7
EVISION
Chapter 3 - Installation
V
™ 3 P
/V
™ 3 S
IVID
RO
IVID
M
ERVICE
ANUAL
3-73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vivid 3

Table of Contents